We Are Now Autostore Installation Certified
Speak to a member of our team
Get in TouchNow nearing completion, the 101,000 pallet cold store development known as Magnavale Easton II accompanies an existing 44,000 pallet cold store located on the same site.
The new cold store has been designed to significantly increase capacity and with careful consideration of efficiency and the needs of the cold chain.
Hills Electrical Group was responsible for:
This was completed with 900 days effort.
Hills Electrical Group delivered the solution on schedule and on budget, delivering a facility with a huge 145,000 pallet positions, the majority of which are fully automated.
The new site will become operational in Q3 2024 and will be run entirely on renewable energy. It will be the most sustainable, efficient and largest cold storage facility in the UK.
Improved Efficiency: The new automation system streamlined operations to an unprecedented degree, significantly reducing manual handling and increasing throughput.
No Single Point of Failure: The cold store has been engineered with no single point of failure, meaning that operations can continue uninterrupted even in the event of system disruptions.
By choosing Hills Electrical Group, you’re not just engaging an outstanding electrical installation supplier, you’re transforming the way your Projects are delivered for the better.
Our team of NICEIC approved engineers, technicians, and project managers are proficient in electrical installation, and prepared to work closely with you to design and implement a solution that positions you for future growth and success. Get in touch today by calling 01384 671660